Home | Story | Layout | Construction | Structures | Operation | Fiddle Yard | Animations | Snow Clearing | Links
Pictures
A.) Pictures of the old line
Picture 1: FO train entering the rack section below Gletsch
Picture 2: The famous Glacier Express crossing the start of the Furka road in the valley.
Picture 3: FO Rotary Snow Plow in Brig (Summer '96);
one of my next scratchbuilding projects!
Picture 4: FO Snow Plow in Brig (Summer '96)
Picture 5: Its early summer and there is still lots of snow. Above equipment was used to clear the line.
B.) Pictures of the layout
Picture 1: View towards the goods shed with the platform and headshunt on the left.
Picture 2: The BVZ shunter Tm 2/2 is moving a boxcar with some valuable liquid in it (for all the non-Swiss: Cardinal = beer)!
Picture 3: Push-pull traction engine Deh4/4 is on stand-by infront of the goods shed
Picture 4: Deh4/4 at the railroad crossing of the Furka Pass road
Picture 5: Deh4/4 ready to leave the station. In the background the Rhone glacier can be seen.
Picture 6: Deh4/4 emerging out of the tunnel and has just left the rack section (Building status 5/9/2001).
Picture 7: View of the two tunnels under construction (building status 5/9/2001).
Picture 8: View of the retention wall at the entrance of the upgoing line (building status 5/9/2001).
Home | Story | Layout | Construction | Structures | Operation | Fiddle Yard | Animations | Snow Clearing | Links