~  STATEMENT CONCERNING A FOUR HOUR TIMED FLOW TEST THAT WAS
    TAKEN ON A WATER WELL OWNED BY 
                                                           
~  THE PROPERTY AND WELL ARE LOCATED AT
                                                  
~  FLOW RESULTS:
    A FOUR HOUR TIMED SUSTAINING FLOW TEST WAS PERFORMED ON
           
    BY JIM LEIGHTON DRILLING COMPANY.
~ THE WELL DEPTH IS REPORTED TO BE _____  FEET DEEP AND ON THE ABOVE
    DATE THE WELL WAS PRODUCING ______ GALLONS PER MINUTE.

FLOW TEST LOG:

     TIME                               QUANTITY           
  1:00 � 1:15                WELL MAKING 3 � GPM
  1:15 � 1:30                LET WELL REST
  1:30 � 1:45                WELL MAKING 3 � GPM
  1:45 � 2:00                LET WELL REST
  2:00 � 2:15                WELL MAKING 3 � GPM
  2:15 � 2:30                LET WELL REST
  2:30 � 2:45                WELL MAKING 3 � GPM
  2:45 � 3:00                LET WELL REST
  3:00 � 3:15                WELL MAKING 3 � GPM
  3:15 � 3:30                LET WELL REST
  3:30 � 3:45                WELL MAKING 3 � GPM
  3:45 � 4:00                LET WELL REST
  4:00 � 4:15                WELL MAKING 3 � GPM
  4:15 � 4:30                LET WELL REST
  4:30 � 4:45                WELL MAKING 3 � GPM

~  RESULTS OF THE FLOW TEST SHOW THAT DURING EACH TEST PERIOD THERE
    WAS NO REDUCTION IN THE AMOUNT OF FLOW.
~ THE WELL IS PRODUCING 3 � GALLONS PER MINUTE WHICH IS ADEQUATE
    FOR NORMAL HOME USE.

~ THE FLOW TEST PASSED.    ___________________________
                                                         Jim Leighton, Owner
Leighton Drilling Co., LLC

SAMPLE FLOW TEST
NOTE: Hand dug wells and cisterns will be tested according to the volume of water they contain.
Leighton Home Page
Leighton Sample Bid Sheet
Leighton Sample Septic Test
To request a flow test or to get
more information*
*When requesting information, please be sure to include your name, address, phone number, and note of information
you are requesting.
Hosted by www.Geocities.ws

1