COTTAGE 6/8/01
HOME
Kelsey walking on the new Pergo laminate floor and inside the elevator with the door and gate closed.
Oak paneling going up in Suzannne and Bill's bedroom.
Stair and elevator paneling.
Base detail for the Great room pillars.
Base and casing detail showing wide trim.
Paneled back of the elevator from the upper loft entry.
Wall to wall oak on the entry hall behind the kitchen.
Doug's landscapers have started the retaining walls.  A real neat job of blending with the 53 year old concrete block.
COTTAGE 2-04-01
COTTAGE DEMOLITION
COTTAGE LOGGING
COTTAGE EXCAVATION
COTTAGE FOUNDATION
COTTAGE BACKFILL & SLAB
COTTAGE FRAMING WALLS
RELATIVES
COTTAGE FRAMING ROOF
KELSEY'S BROKEN ARM
COTTAGE INTERIOR
COTTAGE OUTSIDE
MARG AND DICK
COTTAGE 1-26-01
COTTAGE 2-12-01
COTTAGE 3-04=01
jOhN's FAMILY ALBUM
HALEY'S BASKETBALL
COTTAGE 4-02-01
COTTAGE 4-13-01
COTTAGE 5-6-01
COTTAGE 5-11-01
BUMC
LONG LAKE STORM OF OUGHT ONE
COTTAGE 8-12-01
j0hN's COTTAGE COLLAGE
Hosted by www.Geocities.ws

1